# Force Majeure in Wartime: When Superior Force Really Excuses Performance

> War is not automatically force majeure. Learn when a force majeure clause applies, what you must prove and how to respond correctly to supply failures.

- Author: Viktoriia Sobiera, Sobiera Legal Consulting, Zürich
- Published: 2026-11-18
- Language: en
- Web page: https://sobiera-legal.ch/en/insights/force-majeure-in-wartime/
- Other language versions: [Deutsch](https://sobiera-legal.ch/de/insights/force-majeure-krieg.md), [Français](https://sobiera-legal.ch/fr/insights/force-majeure-en-temps-de-guerre.md), [Українська](https://sobiera-legal.ch/uk/insights/fors-mazhor-pid-chas-vijny.md), [Русский](https://sobiera-legal.ch/ru/insights/fors-mazhor-pri-vojne.md)

![Contract and route motifs on the cover card](https://sobiera-legal.ch/assets/images/articles/blg-force-majeure-krieg.jpg)

A war does not automatically turn a supply failure into force majeure. Whether you can rely on force majeure as a supplier, or whether your business partner is rightly doing so, depends on three things: the exact wording of the clause, the law governing the contract, and proof that the war prevented precisely this performance. In contracts with a connection to Ukraine or Russia, these three questions often sit in different languages and legal systems. Anyone who acts here without a review risks liability for damages instead of relief. This is exactly where we at Sobiera Legal come in: with contract review in German, English, French, Ukrainian and Russian, without going through interpreters.

## In brief

- Many clauses treat war as a typical force majeure event, but it only excuses performance if it makes the specific performance impossible or substantially hinders it and no reasonable remedy was available.
- A war that was already under way when the contract was concluded was foreseeable. For contracts with a Ukraine connection concluded after February 2022, force majeure is therefore considerably harder to justify.
- Additional costs, detours and delays are not force majeure in themselves. That is a matter of hardship, that is, renegotiation or adjustment.
- The clause almost always requires prompt notice to the contracting partner. Anyone who notifies too late or not at all can be liable despite a genuine disruption.
- The contract does not end by itself. Termination or withdrawal requires a basis in the contract or in the law.

## Table of contents

- What force majeure means in a contract
- Is war automatically force majeure?
- Clause, applicable law and proof
- What consequences force majeure has
- Force majeure or hardship: more expensive does not mean impossible
- How to respond to a war-related disruption
- Sanctions as a separate impediment to performance
- Drafting new contracts to withstand war
- Our view on force majeure in wartime
- Review of your force majeure situation
- Frequently asked questions
- Sources

## What force majeure means in a contract

"Force majeure" is the international term, "höhere Gewalt" the German one. The same thing is meant: an external event that was not foreseeable when the contract was concluded and could be neither avoided nor overcome even with reasonable precautions. According to the overview by [IHK Schwaben on force majeure clauses](https://www.ihk.de/schwaben/produktmarken/recht-und-steuern/vertragrecht/force-majeure-klauseln-schutz-vor-hoeherer-gewalt-im-internationalen-handel-4896512), whether such an event exists always depends on the contract, the applicable law and the circumstances of the individual case.

In Germany, the Federal Court of Justice (Bundesgerichtshof) has developed fixed criteria for this. [IHK Köln summarises them](https://www.ihk.de/koeln/hauptnavigation/international/internationale-rechtsfragen/coronavirus-hoehere-gewalt-5613794): an extraordinary event coming from outside, which is not foreseeable, cannot be averted even with the utmost reasonable care, and does not originate in the party's own business. A machine breakdown in your own plant is therefore not force majeure, whereas a missile strike on the supplier's warehouse can be.

Important in practice: this statutory definition is only the starting point. In international contracts, a separate clause usually regulates what counts as force majeure and what happens then. How such a clause is structured and which requirements it typically contains is explained in detail in our article on the [force majeure clause](https://sobiera-legal.ch/en/insights/force-majeure-clause/).

## Is war automatically force majeure?

No. War, civil war, comparable armed conflicts, embargoes, export bans and official measures are indeed among the typical events listed in force majeure clauses. However, they trigger the clause only if they actually impair performance. IHK Köln expressly stresses that the war in Ukraine does not justify force majeure across the board. What matters is whether it makes the specific performance of the contract impossible or substantially hinders it, and whether a reasonable remedy would have been possible.

The model clause of the International Chamber of Commerce (ICC), on which many contracts are based, goes a step further. According to the [DGTR evaluation of war risk in international sales law](https://dgtr.de/wp-content/uploads/DGTR_Kolloquium_2024_Piltz.pdf), war, whether declared or not, hostilities and invasion are presumed to be force majeure events there. The presumption makes it easier to get started but does not replace the rest: the affected party must still show that it could not avoid or overcome the consequences.

### The time the contract was concluded

Probably the most important question for contracts with a Ukraine connection is: when was it signed? In her 2024 [analysis of war, sanctions and exemption under the UN Convention on the International Sale of Goods](https://cisg-online.org/files/commentFiles/Dikovska_105_StudiaIuridica_2024_7.pdf), the lawyer Iryna Dikovska concludes that a war that begins only after the contract is concluded is more likely to be regarded as unforeseeable than one that was already under way at signing.

In practice this means: a supply contract from 2021 with a plant in Kharkiv stands in a very different position from a contract concluded with the same plant in 2024. Anyone who contracts into an ongoing conflict knows the risk and must regulate it in the contract itself. The same applies to any other conflict that was already known at signing.

### The specific performance and the cause

The second point to check is causation. It is not enough that there is war somewhere and the goods do not arrive. It must be shown that precisely the war prevented precisely this delivery and that there was no reasonable alternative: another port, another upstream supplier, another route. In its study ["Dealing with Force Majeure events in international trade"](https://iccitalia.org/wp-content/uploads/2025/03/dealing-with-force-majeure-events-in-international-trade.pdf), the ICC gives an example from the Ukraine crisis: mere transport delays and additional costs due to alternative routes do not justify automatic exemption.

## Clause, applicable law and proof

Which rules apply depends on what the contract says and which law governs. In cross-border sales of goods this is often the UN Convention on Contracts for the International Sale of Goods (CISG), an international treaty that applies automatically in many states unless the parties exclude it. Under Art. 79 CISG, the party must prove that its non-performance was due to an unforeseeable impediment beyond its control and that it could not avoid or overcome its consequences despite reasonable efforts, according to IHK Köln.

A separate clause can displace this statutory rule. Dikovska finds that force majeure, hardship, war and sanctions clauses in CISG contracts can exclude the application of Art. 79 entirely or in part. That is why the wording matters so much: it decides which events count, which deadlines run and which consequences follow.

| Starting point | What applies first | What you must check |
| --- | --- | --- |
| Contract with its own force majeure clause | The clause itself | List of events, notice period, evidence requirements, legal consequences |
| Sale of goods without a clause, CISG applicable | Art. 79 CISG | Unforeseeability, cause, reasonable remedy |
| Contract under German law without a clause | BGB, e.g. §§ 275, 313 | Impossibility or frustration of the basis of the transaction |
| Contract under Swiss or other law | The rules applicable there | Different requirements and consequences |
| Conflicting general terms and conditions of both sides | First clarify which terms apply | Whether a clause became part of the contract at all |

The last case is more common than many think. If buyer and seller each refer to their own terms and conditions, it is often unclear which force majeure rule applies at all. How this is resolved is shown in our article on the [battle of forms in general terms and conditions](https://sobiera-legal.ch/en/insights/battle-of-forms-contract/).

Language is a further factor. Contracts with partners in Ukraine or Russia often exist in two versions, for example Russian and English, and the versions are not always identical. Whether "military actions" means the same as the Russian or Ukrainian term in the parallel version can decide the exemption.

## What consequences force majeure has

The legal consequences arise primarily from the agreed clause. According to IHK Schwaben, three stages are typical: the obligation is temporarily suspended, deadlines are extended, and under certain conditions the contract can be terminated. According to the DGTR evaluation, a clause successfully invoked can exclude the duty to perform and certain claims for damages during the impediment, provided the party gave notice as promptly as the clause requires.

For contracts under German law, [IHK Köln describes the statutory consequences](https://www.ihk.de/koeln/hauptnavigation/recht-steuern/hoehere-gewalt-bei-vertraegen-7050678): if performance is impossible, the duty to perform can lapse under § 275 BGB. Under § 326 BGB, the claim to the counter-performance, that is, payment, then also lapses in principle. Rights of withdrawal must be examined separately.

Two points are regularly overlooked in practice:

- **The contract does not end automatically.** Termination must arise from the contract or the law and, as a rule, must be declared.
- **Art. 79 CISG only exempts from damages.** It does not cancel the contract and does not release the party from all other obligations, as IHK Köln emphasises.

How differently national legal systems regulate the binding force of a contract and the consequences of withdrawing is shown, for example, by the [Contrato de Arras in Mallorca](https://blog.mallorca-immobilien.com/blog/contrato-de-arras-mallorca): there, the type of down payment determines who loses what on withdrawal. The same principle applies to force majeure: without a look at the applicable law, no consequence can be predicted with certainty.

## Force majeure or hardship: more expensive does not mean impossible

Many companies feel the war not as a supply stop but as a cost explosion: energy, freight, insurance, raw materials. Legally, that is a different topic. Hardship describes a situation in which performance remains possible but the economic balance of the contract has been fundamentally shifted.

Under the UNIDROIT Principles, an internationally widespread set of rules for commercial contracts, a party must, according to the ICC study, in principle perform even if performance becomes more expensive. In the case of hardship, it can demand renegotiation without delay but may not stop performing for that reason alone. If the talks fail, a court may, in certain circumstances, terminate or adapt the contract to restore the balance.

In German law, this role is played by the disruption of the basis of the transaction: if performance is possible but the basis of the contract is seriously disrupted, an adjustment under § 313 BGB may come into consideration, according to IHK Köln. Anyone who wrongly declares "force majeure" here and stops delivery breaches the contract. We deal with the difference and the appropriate clauses of both types in [Force Majeure vs. Hardship](https://sobiera-legal.ch/en/insights/force-majeure-vs-hardship/).

## How to respond to a war-related disruption

Whether you are unable to deliver yourself or your partner invokes force majeure, the sequence is similar in both cases. IHK Köln recommends reviewing the clause for covered events, causation, evidence and information duties, deadlines and legal consequences, and securing supporting documents.

- **Gather the contract and all versions.** Main contract, annexes, general terms and conditions, orders, order confirmations, including the Russian or Ukrainian version. Typical mistake: only the English working version is read, although the other language version was agreed as authoritative. Here we review both versions directly in the original.
- **Determine the applicable law.** Choice-of-law clause, CISG, place of jurisdiction or arbitration clause. Whether Art. 79 CISG, the BGB, the Swiss Code of Obligations or another system applies depends on these.
- **Document the event and the cause.** Official orders, port or border closures, notices from the upstream supplier, photos, correspondence. Typical mistake: general press reports instead of evidence relating to your own order.
- **Examine and record remedies.** Which alternative routes, replacement suppliers or partial deliveries were possible, and at what effort? Anyone who tries nothing fails on the requirement "not surmountable".
- **Give notice on time and in the right form.** The clause usually specifies the deadline and form. Missing or late notices and failure to mitigate loss can trigger claims against you, according to IHK Köln. The notice should be in the contract language; we draft it so that it holds up in both versions.
- **Choose and negotiate the consequences.** Suspension, extension of deadlines, adjustment or termination. At the same time, it must be clarified whether hardship or a price adjustment clause is not the right route.

If you are the buyer and your supplier invokes force majeure, you reverse the same steps: demand evidence, check the deadline for notice and record which remedy your partner failed to take. We explain what rights you have in the event of supply problems under Swiss sales law at [Rights in case of defects and supply problems](https://sobiera-legal.ch/en/insights/sales-contract-defects-switzerland/).

## Sanctions as a separate impediment to performance

In business with Russia, the impediment is often not the war itself but an embargo or export ban. IHK Schwaben counts both among the typical possible force majeure events, again only if they specifically impair performance. Dikovska points out that separate sanctions clauses can displace the statutory exemption rules in whole or in part.

For companies this means: a non-delivery caused by sanctions is first a compliance question and only then a contract question. Anyone who delivers although they are not allowed to has a bigger problem than a contract dispute. Sanctions compliance therefore belongs in the same review as the force majeure clause.

## Drafting new contracts to withstand war

Much can be learned for new contracts from the disputes of recent years. IHK Schwaben recommends an express and specific regulation of the covered events, the notice and cooperation duties and the desired legal consequences. In practice, the following have proved their worth:

- a list of events that expressly names war, mobilisation, sanctions and export bans, also for conflicts already under way, if both sides want that;
- a clear notice period with form and addressee;
- a step sequence: first suspension, then, after a fixed period, a right of termination for both sides;
- a separate hardship or price adjustment clause for cost spikes;
- a language clause that stipulates which version prevails in case of discrepancies.

What else Swiss SMEs should note in contracts with partners in Ukraine we have summarised in [Contracts with a Ukraine connection](https://sobiera-legal.ch/en/insights/contract-drafting-ukraine-nexus/). For negotiations in English, it is worth looking at our article on [contract negotiation in English](https://sobiera-legal.ch/en/insights/contract-negotiation-english/).

## Our view on force majeure in wartime

> In war-related contract disruptions, it is rarely the big legal question that decides, but the detail: a word in the Russian version, a deadline in an annex, a choice of law that nobody remembered any more. Exactly these details get lost when a contract is first translated and then reviewed. That is why we work differently: we read and negotiate contracts directly in German, English, French, Ukrainian and Russian, without external interpreters. This saves time, and it protects against the most expensive mistake in these cases: a clause that excuses in one language and not in the other. Ukraine and Russia mandates and sanctions compliance are a focus of our firm. Anyone who invokes force majeure or wants to fend off such an invocation needs both together: contract law and a view on sanctions. And anyone concluding new contracts with partners in the East should write the lessons of this war straight into the clause. Bitblade

## Review of your force majeure situation

If your partner asserts force majeure or you are unable to deliver yourself, we begin with an initial meeting and an assessment from CHF 150 per hour. For contracts that are being newly created or need to be adapted, we offer contract review and contract drafting.

For companies that trade continuously with partners in Eastern Europe, we provide support with an SME retainer from CHF 500 per month. You can find all services and packages in our [overview of legal packages](https://sobiera-legal.ch/en/packages/), and our focus areas in [international contract law and Ukraine mandates](https://sobiera-legal.ch/en/services/).

## Frequently asked questions

### Is the war in Ukraine a case of force majeure?

Not automatically. It can trigger a force majeure clause if it makes the specific performance impossible or substantially hinders it and no reasonable remedy was available. For contracts concluded only after the war began, this is considerably harder to justify, because the war was known at signing.

### Can I rely on force majeure because of increased costs?

As a rule, no. Additional costs, detours and delays make performance more expensive but not impossible. For this there are hardship and price adjustment clauses or, in German law, adjustment due to disruption of the basis of the transaction.

### What happens if I send the notice too late?

Many clauses tie the exemption to prompt notification. If it is missing or arrives too late, your partner can assert its own claims, even if the disruption itself was genuine. Therefore report early, in writing and in the form the contract requires.

### Does the contract end by itself in case of force majeure?

No. Usually the obligations are first suspended and deadlines extended. Termination requires a basis in the contract or in the law and, as a rule, must be declared.

### Does anything apply without a clause?

Yes, then the applicable law applies, in international sales of goods often Art. 79 CISG. It exempts from damages but does not cancel the contract. Which law applies is the first question of any review in cross-border contracts.

## Sources

[IHK Schwaben: Force majeure clauses in international trade](https://www.ihk.de/schwaben/produktmarken/recht-und-steuern/vertragrecht/force-majeure-klauseln-schutz-vor-hoeherer-gewalt-im-internationalen-handel-4896512)

[IHK Köln: Pandemics, wars and supply failures, force majeure in international contracts](https://www.ihk.de/koeln/hauptnavigation/international/internationale-rechtsfragen/coronavirus-hoehere-gewalt-5613794)

[IHK Köln: The meaning of force majeure in contracts](https://www.ihk.de/koeln/hauptnavigation/recht-steuern/hoehere-gewalt-bei-vertraegen-7050678)

[DGTR: The treatment of war risk in international sales law (2024)](https://dgtr.de/wp-content/uploads/DGTR_Kolloquium_2024_Piltz.pdf)

[Iryna Dikovska: War, Sanctions and Exemption from Liability under the CISG (2024)](https://cisg-online.org/files/commentFiles/Dikovska_105_StudiaIuridica_2024_7.pdf)

[ICC: Dealing with Force Majeure events in international trade](https://iccitalia.org/wp-content/uploads/2025/03/dealing-with-force-majeure-events-in-international-trade.pdf)

## Recommendations

- [Force Majeure Clause: Effect, Requirements and Drafting](https://sobiera-legal.ch/en/insights/force-majeure-clause/)
- [Force Majeure vs. Hardship: The difference for your contracts](https://sobiera-legal.ch/en/insights/force-majeure-vs-hardship/)

---

Source: https://sobiera-legal.ch/en/insights/force-majeure-in-wartime/ — Sobiera Legal Consulting, Zürich. The articles are general information on Swiss law and do not replace advice on an individual case.